Process Overview
This assembly automation solution uses a YUSHIN take-out robot (SCⅡ-150) to automate the process of insert-molding a steel plate into a plastic injection-molded part during production. By automating both the insert-loading operation and the downstream inspection process, the system minimizes control points while improving overall productivity.
Components
| Robot | YUSHIN SCII-150D (for insert loading) 5-axis Cartesian robot + 90° tilting arm, payload 5 kg, repeatability ±0.1 mm Work envelope/stroke: Travel 1,500 mm / Fore–aft 468 mm / Vertical 850 mm 3-axis Cartesian unit: Vacuum grippers ×2 |
|---|---|
| Peripherals | EOAT / Tooling - Tool changer (rotary type): tool change via rotation - Pneumatic grippers ×4 (for part take-out) - Vacuum grippers ×4 (for insert loading) Peripheral Equipment - Injection molding equipment (optional / separate) - Bowl feeder (steel plate feeding) - Steel plate loading jig - Finished-product discharge conveyor |
Workflow
| STEP 1. | Singulate and feed two steel plates at a time via the bowl feeder |
|---|---|
| STEP 2. | Pick two steel plates per cycle and place them into the 8-position loading jig |
| STEP 3. | Pick a set of eight steel plates and transfer them to the injection molding machine |
| STEP 4. | Take out the molded part and load the steel plates |
| STEP 5. | Discharge the finished product via the outfeed conveyor. |
※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.
Recommended Use Cases
PCB Flex Cable Insertion using Epson N2 and FT Sensors
This assembly automation solution utilizes the Epson N2 robot and FT (Force-Torque) sensors to automate the highly difficult process of inserting Flex Cables into PCB connectors. It is the optimal solution for performing high-precision assembly tasks while minimizing cycle times within confined workspaces. This project was initiated to automate the Flex Cable insertion process, which previously relied entirely on manual labor.
Smartphone Sorting & Stacking using UR5 and Linear Track
This automated sorting and storage solution utilizes a Universal Robots UR5 collaborative robot mounted on a Linear Track (7th axis) to perform high-precision handling of smartphones. By integrating 2D Vision, the system identifies the type and position of items arriving via conveyor. The 6-axis articulated robot then uses an electric gripper to sort and stack these items into specific locations. Conversely, when a retrieval command is received, the robot can pick the required items from the storage rack and move them to the discharge position. The linear track allows the robot to cover a significantly wider workspace, making it ideal for comprehensive inbound/outbound inventory management.
Aluminum Dross Processing using Yaskawa Robots
This automation solution utilizes YASKAWA robots to automate the hazardous manual process of handling high-temperature aluminum dross (a byproduct of molten aluminum). By deploying a robot with high heat resistance, this system replaces human operators in extreme thermal environments, ensuring workplace safety and enabling continuous, non-stop operation. The primary goal of this project was to enhance operational safety and improve the work environment by automating the byproduct treatment following high-heat aluminum processing.
Process Overview
This assembly automation solution uses a YUSHIN take-out robot (SCⅡ-150) to automate the process of insert-molding a steel plate into a plastic injection-molded part during production. By automating both the insert-loading operation and the downstream inspection process, the system minimizes control points while improving overall productivity.
Components
| Robot | YUSHIN SCII-150D (for insert loading) 5-axis Cartesian robot + 90° tilting arm, payload 5 kg, repeatability ±0.1 mm Work envelope/stroke: Travel 1,500 mm / Fore–aft 468 mm / Vertical 850 mm 3-axis Cartesian unit: Vacuum grippers ×2 |
|---|---|
| Peripherals | EOAT / Tooling - Tool changer (rotary type): tool change via rotation - Pneumatic grippers ×4 (for part take-out) - Vacuum grippers ×4 (for insert loading) Peripheral Equipment - Injection molding equipment (optional / separate) - Bowl feeder (steel plate feeding) - Steel plate loading jig - Finished-product discharge conveyor |
Workflow
| STEP 1. | Singulate and feed two steel plates at a time via the bowl feeder |
|---|---|
| STEP 2. | Pick two steel plates per cycle and place them into the 8-position loading jig |
| STEP 3. | Pick a set of eight steel plates and transfer them to the injection molding machine |
| STEP 4. | Take out the molded part and load the steel plates |
| STEP 5. | Discharge the finished product via the outfeed conveyor. |