Features
Higher Productivity
Line production capacity (CAPA) improved by 30% through parallel operation.
Buffering for pallets, styrofoam, and slip sheets enables continuous production capability.
Quality Consistency
Standardized palletizing for defined battery and pattern specifications ensures consistent pallet quality.
Anti-drop prevention design helps reduce defects.
Improved Work Environment
Automation within the operator’s work zone reduces fatigue and injury risk.
Helps prevent musculoskeletal disorders caused by repetitive tasks.
Reduced Operating Cost
Instead of one operator running one palletizer, one operator can run two palletizers, reducing operating cost relative to output increase.
Prompt Project Completion
Using prior references and simulation, the line removal, installation, and stabilization were completed within 5 days of line downtime.
Results
| Client Feedback | The customer stated, โAfter Marosol set up the palletizing line, material flow became smoother than before, and operator satisfaction increased due to a significant reduction in manual work. Despite the short installation schedule and initial concerns about a new vendor, the team completed line removal, installation, and ramp-up within just five days without a single drop incident. We validated more than 40 SKUs, stabilized quickly without impacting production output, and even our management team praised the results. In addition, Marosolโs engineers responded immediately to on-site variables through direct support, making deployment very smooth and resulting in high field satisfaction. |
|---|
โป The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.
Recommended Use Cases
Silicone Molded Part Palletizing using AIM AIVE System and Delta SCARA Robot
Silicone Molded Part Palletizing using AIM AIVE System and Delta SCARA Robot
Yaskawa Industrial Robots + Automatic Styrofoam Placement?! Korea & Company Battery Palletizing Automation Case Study ๐๐ค
Korea & Company's palletizing solution prioritizes increasing production volume and reducing the workforce. We secured production capacity by dismantling the existing single-palletizer line, branching it into two lines, and configuring two palletizers. Additionally, by automating the manual stacking of styrofoam and plywood, we reduced the need for worker intervention, allowing a single worker to manage both lines.
Order Picking using Yaskawa and Mech-Mind
This logistics automation solution utilizes Mech-Mind 3D Vision and the Yaskawa GP8 robot to automate the order picking of various unstructured objects. By leveraging a highly cost-effective 3D vision system that recognizes both the position and shape of products, the system can perform picking tasks without additional manual teachingโeven when new products are added or existing ones are changed. The project was specifically designed to automate the picking of irregular items in logistics center picking zones.
Features
Higher Productivity
Line production capacity (CAPA) improved by 30% through parallel operation.
Buffering for pallets, styrofoam, and slip sheets enables continuous production capability.
Quality Consistency
Standardized palletizing for defined battery and pattern specifications ensures consistent pallet quality.
Anti-drop prevention design helps reduce defects.
Improved Work Environment
Automation within the operator’s work zone reduces fatigue and injury risk.
Helps prevent musculoskeletal disorders caused by repetitive tasks.
Reduced Operating Cost
Instead of one operator running one palletizer, one operator can run two palletizers, reducing operating cost relative to output increase.
Prompt Project Completion
Using prior references and simulation, the line removal, installation, and stabilization were completed within 5 days of line downtime.
Results
| Client Feedback | The customer stated, โAfter Marosol set up the palletizing line, material flow became smoother than before, and operator satisfaction increased due to a significant reduction in manual work. Despite the short installation schedule and initial concerns about a new vendor, the team completed line removal, installation, and ramp-up within just five days without a single drop incident. We validated more than 40 SKUs, stabilized quickly without impacting production output, and even our management team praised the results. In addition, Marosolโs engineers responded immediately to on-site variables through direct support, making deployment very smooth and resulting in high field satisfaction. |
|---|
โป The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.










