marosol

Solution thumbnail

Process layout

This robot can be integrated into an automated hospital delivery solution utilizing the autonomous mobile robot FORMER.


By utilizing mobile robots for the frequent inter-departmental item delivery tasks within the Hospital , safe Delivery to designated locations is possible in complex indoor environments.


This project was conducted to reduce work fatigue by minimizing the travel distance of Hospital staff and to strengthen customer responsiveness through efficient division of labor.


Components

Robot

Mobile Robot - ROAS FORMER (Payload: 70kg, Max Speed: 1.5m/s, Operation/Charging Time: 4/2.5 hours, Charging Method: Automatic (Charging Station Option Included), Weight: 35kg, Minimum Ground Height: 60mm)

Peripherals

Upper cargo compartment (made separately)

Workflow

STEP 1.Loading of items requiring transport
STEP 2.Specify a delivery location
STEP 3.Move to the delivery address
STEP 4.Return after delivery is completed

Features

Minimize implementation time and cost with simple installation

It is possible to determine one's own location and search for a path without installing separate equipment, enabling reduced implementation time and cost savings by eliminating the need for additional facilities

Flexible response possible when changing layout or work location

The upper mounting bracket is modular and can be attached or detached



Small and compact size

Effective movement even within narrow spaces

It can rotate 360 degrees in place using differential drive.



Rental & Service Program

Initial investment costs can be reduced through the rental program



Rest assured with the defect warranty period

1-year warranty provided


Results

Key Benefits
Reduction of worker fatigue and improvement of job satisfaction
Client Feedback
Hospital staff satisfaction has increased as the cumbersome task of delivery and collecting items has been reduced.

Unauthorized copying or reproduction of any content on Marosol may violate the Unfair Competition Prevention Act and Copyright Act.

Hospital Supply Delivery using Mobile Robots (FORMER robots)

Lead Time
4 weeks(3 weeks for manufacturing, 1 week for installation and commissioning)
Estimated Budget
Please log in to view
Application Field
Application > Delivery, Building Type > Hospital

Curious about the robots used?