This application automates injection handling using a KUKA KR10. It is an automation project that feeds and unloads two types of pipe products into/from a process line. The job requires placement to a specific position with repeatability within 0.1 mm. The system uses a vision-based alignment station for supply handling and improves process stability through precision operations.
Project Background and Objectives
Automate feeding and unloading for two pipe product types
Achieve high-precision placement (≤0.1 mm repeatability requirement)
Stabilize the process using a camera-based alignment fixture and precision handling
Components
| Robot | KUKA KR10
|
|---|---|
| Peripherals |
|
Workflow
| STEP 1. | Feed products from the supply unit |
|---|---|
| STEP 2. | Align the position using the camera |
| STEP 3. | Place products on the alignment fixture (2 pcs × 2 cycles) |
| STEP 4. | Pick four products simultaneously with the robot and load them into the mold |
※ The content provided by Marosol is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.