marosol

Haemil FA Collaborative Robot & AMR

Solution Provider
Please log in to view
Application Field
Industry > Semiconductor·Display, Application > Logistics, Sector > Logistics
Industry > Semiconductor·DisplayApplication > LogisticsSector > Logistics

Features

  • Operational Efficiency and Safety

    • Market Proven AMR: Secured stability with the world's No. 1 market share in autonomous mobile robots.

    • Efficient Space Utilization and Optimal Logistics Routing: Applied SLAM-based 3D mapping and Digital Twin CCTV monitoring.

  • Max 12–18 Months ROI

    • Labor replacement effect for loading and transport tasks.

    • Labor costs (including incidental expenses) X 2 Shifts = 90–100 million KRW per year.

    • Flexibility in human resource management and operations.

  • Warranty Period: 1 year provided.

Results

Key Benefits
Reduced operational losses + reduced accidents = increased opportunity cost.
Client Feedback
"Thanks to the outstanding performance of the logistics robots, we were able to configure stable and accurate logistics scenarios."

※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.

Recommended Use Cases

Heavy Logistics Automation Succeeded! Omron AMR Automatically Returns Lead Tabs 📦🤖

Heavy Logistics Automation Succeeded! Omron AMR Automatically Returns Lead Tabs 📦🤖

Process Overview This case study demonstrates the automation of heavy-duty product transport using Omron AMR logistics robots . The client implemented a logistics automation system to reduce inefficiencies and labor burdens associated with repetitive, heavy logistics tasks. Specifically, they sought to reduce costs and maximize logistics efficiency through automated palletizing and return operations. This solution automates simple, repetitive tasks like product movement and loading, thereby increasing the efficiency and accuracy of the shipping process and reducing worker burden, thereby enhancing safety and productivity. Project Background and Objectives The client recognized the need for automation in heavy cart transport and lead tab return operations and sought to improve logistics operational efficiency and reduce operating costs by introducing AMRs. This project aimed to: Automating lead tab return and cart transport Improving worker productivity and ensuring safety Enhancing efficiency and flexibility in the logistics field

An Order Picking System Solution for Logistics Warehouses using AMRs

An Order Picking System Solution for Logistics Warehouses using AMRs

Process Overview This case study demonstrates an order picking system that optimizes the operation of ten Eugene Gocart 180s using Marosol's remote control system, SOLlink. With the self-developed SOLlink, multiple AMRs are clustered and controlled to maximize logistics system efficiency. The order picking system, integrated with WMS, allows for flexible handling during peak periods without the need for additional workers. Warranty Period 1 Year Performance Year 2023 Project Duration Need for consultation Project Background and Objectives Improved workforce supply and employment stability through the introduction of logistics robots Introducing robots for high-intensity, repetitive tasks reduces the risk of musculoskeletal disorders and industrial accidents among workers Integrating WMS and order picking systems increases work efficiency and reduces error rates

Full Automation of Injection Molding Line Logistics with AMR Logistics Robots

Full Automation of Injection Molding Line Logistics with AMR Logistics Robots

Process Overview This case study demonstrates an inline logistics solution that utilizes the Yujin Robot GoCart180 and an upper conveyor module to automatically transport plastic injection products from the injection molding machine to the shipping facility. By developing a conveyor module tailored to the customer's production line, we automated product loading and unloading, achieving complete automation throughout the entire inline transport process without operator intervention. Warranty Period 1 Year Performance Year 2023 Project Duration Need for consultation Project Background and Objectives Injection molding manufacturing in-line labor shortage Factory operations are disrupted due to difficulties securing workers Workers avoid work due to the risk of musculoskeletal disorders and industrial accidents

ⓒ2020-2026 Bigwave Robotics Inc. All Rights Reserved.

Bigwave Robotics Inc.

Bigwave Robotics serves only as an e-commerce intermediary for certain products listed by third-party vendors on Marosol and is not the seller of record for those transactions. Bigwave Robotics shall not be held liable for any product information, transactions, or related issues concerning items registered by third-party sellers.

ⓒ2020-2026 Bigwave Robotics Inc. All Rights Reserved.