Process Overview
Verification of operational stability of cleaning within each zone: 2 units in Incheon Airport T1 and 2 units in T2
Based on verified operational stability, the goal is to expand the introduction of the robots to all areas of Incheon Airport
Warranty Period
1 year
Year of Execution
2024
Project Period
30 days
Project Background and Objective
The inconveniences of the robots used previously
Since an automatic water supply and drainage system is not provided, people have to manually drag and dispose of the water during water supply and drainage
When filled with water, it weighs over several hundred kilograms, and managing it is difficult because such a heavy product has to be dragged out
Proposal of Water Supply and Drainage Scenarios via Workstation and SOLlink Remote Control
For the Gausium cleaning robot, automatic charging and automatic water supply and drainage functions are supported via the workstation
If the water supply and drainage functions are difficult to use due to facility agreements, the pantry can be set as a maintenance point via SOLlink to remotely move the robot to that location, providing management convenience
Components
| Robot | Marosol Industrial Cleaning Robot SC75 |
|---|
Workflow
| STEP 1. | Select the designated cleaning area |
|---|---|
| STEP 2. | Set the simple cleaning mode (Dry) |
| STEP 3. | Start cleaning |
| STEP 4. | Return to the charging dock after task completion |
| STEP 5. | Schedule the desired cleaning times |
| STEP 6. | Start cleaning |
| STEP 7. | Return to the charging dock after task completion |
※ The content provided by Bigwave Robotics is protected under U.S. and Canadian copyright and intellectual property laws. Unauthorized reproduction, distribution, or use of this content is strictly prohibited.